vrijdag 10 juli 2009

10th of July, the progress...

It is amazing how hard the bricklayers have worked last weeks !

26th of June 2009, the inside front wall.


The whole raw-building ground floor is finished !!! The walls inside are all done, the concrete stairs from ground floor to first floor is done, the blue Limestone for the facade is placed, the concrete rafter is done, a part of the outside wall in old looking bricks is done on the backside of the house,.... But the next three weeks they do not work, because of their summer holidays.

The back wall today with the old looking bricks.



The concrete rafters (ground floot/first floor)




Ground floor : a part of the living room.
Door at left : store-room or washing room.
Door in the back : to their own passage.




Sight from the living room to the open kitchen
on the floor ground.



The concrete "downstairs"....

The first part of the passage (entrance).
The second part of the passage with the elevator and the stairs.
The bleu limestone on the front wall.
Wednesday we've gone to Sint Truiden to choose our flooring materials. We have chosen for blue Limestone in old type paving. We liked the stone washed dark antique finish of those Limestones. In the passage and our bathroom we prefered a pattern of bluestone and an old looking beige stone.


This is the bleu Limestone for the living rooms, I like this design.






This is +/- the floor pattern for the passage and the bathroom.


For the bedrooms we are going for a wooden hardfloor in oak. But I am still comparing the prices.
So many dreams to go .....