zaterdag 24 april 2010
vrijdag 23 april 2010
Jarno's Room
Today it seemed to go fast... you could see the result. And that's good, because Eddy did a lot of work.%5D.JPG)
We prepared everything the last weeks to move to the ground floor appartment for the first months. In the meantime we could finish our floors.
%5D.JPG)
We prepared everything the last weeks to move to the ground floor appartment for the first months. In the meantime we could finish our floors.
I am bringing the floor tiles two by two to the first floor. When Eddy has finished the bedrooms he can start with the floortiles without he has to bring everything upstairs.... %5D.JPG)
Also I brought the wood for Tabitha's room upstairs.
Jarno's room is floored !
It is 19.00 hours now.
It is 19.00 hours now.
vrijdag 16 april 2010
April 2010 the result
The "pur"
Especially Eddy has done a lot of work on the house. The contractor has finished the last works on the floor for his side : laying the sound isolation, the floor heating, the "pur" isolation and the last concrete floor. The rest of the work on the floor, is ours (meaning Eddy's !). The terrace is finished with a wooden floor.
Eddy has done a lot of work the last weeks : he finished the attick, laying the laminate floor. And today he worked a whole day long to place 4 doors on the second floor : from the bedrooms and the toilet. But he has done excellent work, the result is beautiful. We let you enjoy the pictures.
Abonneren op:
Reacties (Atom)