The "pur"
Especially Eddy has done a lot of work on the house. The contractor has finished the last works on the floor for his side : laying the sound isolation, the floor heating, the "pur" isolation and the last concrete floor. The rest of the work on the floor, is ours (meaning Eddy's !). The terrace is finished with a wooden floor.
Eddy has done a lot of work the last weeks : he finished the attick, laying the laminate floor. And today he worked a whole day long to place 4 doors on the second floor : from the bedrooms and the toilet. But he has done excellent work, the result is beautiful. We let you enjoy the pictures.
Geen opmerkingen:
Een reactie posten