We'll be pressed for time.... it's frosty weather and that means that the contractor will not work any more.... AND WE HAVE TO MOVE END OF FEBRUARY !!!
The windows would be placed on 19th of January, than they can poor the second concrete-floor (after the placement of the underfoor heating), and than they can plaster the walls.
The bleu stone for the stairs, the electricity and water-pipes (already done the preparations), plastering of the ceilings, placing the elevator : all those things must still be performed...
Than we have to do some work ourselves : the finishing of the electricity, the floors in bleustone, placing the kitchen on the groundfloor, making and placing the kitchen of the first floor, the floors in old oak parquet, placing the inside doors, making the cabinets in the entrance hall and laundry rooms, a second and third isolation of the attick, the finishing of the bathrooms and showers, the finishing of the toilets, the garden on the back side, the parking place on the frontside .... all work for us. In seven or eight weeks ????
I know wherefore Eddy is so nervous.